Anggerik Heights 2
Taman Anggerik Utama, Bentong, Pahangby Bentong Majujaya Sdn Bhd
Terrace house in Bentong, Pahang
- 71Units
- 4Bedrooms
- 2Bathrooms
- 900 to 1,706Sq ft
- 2028Ready
2026 launches
Launched 9 Oct 2026. 41 of 71 units still available.
Licensed project
Sales permit 30672-1/06-2028/0464(N)-(L)
Key dates
- Launched (first sale signed)
- 9 Oct 2026
- Sales permit issued
- 23 Jun 2026
- Handover promised in SPA
- 9 Oct 2028
Location
Why consider Anggerik Heights 2
- Freehold land tenure
- Single-storey terrace houses, with 71 units in the scheme
- Corner and end-lot units offered alongside intermediate units
- Eight layouts from 900 to 1706 sq ft, all with 4 bedrooms
About this property
Single-storey terrace houses in Bentong, Pahang, with 71 units across eight layouts
Anggerik Heights 2 is a terrace house project in Bentong, Pahang, built on Lot 1143 in Mukim Bentong, Bentong district. The developer is Bentong Majujaya Sdn Bhd, and completion is set for April 2028.
The scheme has 71 single-storey terrace units in intermediate, end-lot and corner positions. The eight layouts, RT1, RT1A, RT1B, RT2, RT2A, RT2B, RT2C and RT2D, all have four bedrooms, and built-up sizes run from 900 sq ft to 1706 sq ft.
Unit types
RM295k to RM588k across all types
- 4 bed
- 2 bath
- 900 sq ft
Floor plan not available yet
Ask for the floor planPrice check
Listed at about RM308 per sq ft, 19% above the median of RM259 psf for 5 terrace, townhouse and cluster homes launched since 2016 in Bentong.
See the nearby launches. This compares listed prices; it is not a valuation.
Project records
- Developer
- Bentong Majujaya Sdn Bhd
- Status
- Construction not started
- Sales permit
- 30672-1/06-2028/0464(N)-(L)
- Bumiputera quota
- 100%
Updated 5 Nov 2026.
Nearby projects
Within 3 km
Taman Anggerik Heights (Phase 1)
Bentong, Pahang
Semi-detached, Terrace house · 4 bed · Ready 2026
RM338k to RM618k
5 of 80 units left
Launched 12 Jun 2024
Taman Azalea (Phase 1)
Bentong, Pahang
Terrace house · 4 bed · Ready 2027
RM529k to RM899k
32 of 85 units left
Launched 26 Nov 2025

